Driving Lasting Change

After four years of development and listening to over 70,000 customers, our 2025–30 business plan was approved by Ofwat in 2024. Rated outstanding and backed by 81% of our customers, it commits us to investing £15 billion — more than double the last five years — to transform services for our 4.6 million customers across the Midlands.

 

Our biggest investment yet

Between 2025 and 2030, we’re committing a record £15 billion to improving our water, protecting our environment and supporting the communities we serve.

This is the most ambitious investment programme in our history. It means upgrading ageing pipes and treatment works, building new infrastructure, enhancing river health, reducing flooding and pollution risks, and making our networks more resilient for future generations.

To put it into perspective, that’s over £8 million every single day until 2030 — the equivalent of more than £3,000 for every household we serve It’s a scale of investment that will deliver real change, where it matters most, for the 4.6 million households who rely on us every day.

You can see a full copy of the plan we submitted to Ofwat, and how Ofwat responded, in our Regulatory Library.

What this means for you

We’ve listened to our customers and shaped our plans around three things that matter most to them. Here’s a quick overview of some of the things we’ll be working on up to 2030.

A reliable water supply that’s fit for the future

A growing population and climate change mean we need to plan wisely, so clean, dependable water is always available across our region.

Looking after the places we all love

Our rivers, streams and green spaces belong to everyone. We want people – and the wildlife that depends on them – to enjoy these places long into the future.

Supporting our customers and the places where they live

There’s more to what we do than providing water. We’re here to support people when they need us and to play a positive role in our local communities.

What you can expect from us by 2030

These are the main improvements you can expect to see from our planned work up to 2030.

Against most of them there is a target – called a Performance Commitment Level (PCL) – which is what we agree with our regulators (OFWAT, the Drinking Water Inspectorate, the Environment Agency and the Consumer Council for Water)

What you can expect from us

PCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

We want your water supply to be available 24 hours a day, 365 days a year.

Interruptions can still happen, but our target is to keep the average interruption time across all customers to no more than five minutes per customer each year. 

Average 5.00 minutes per customer per year

Average 5.41 minutes per customer per year

 

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

Your drinking water is very high quality and incredibly safe. To ensure this, CRI measures risks to its quality. The lower the CRI score, the better. 

We plan to bring our CRI score down by 45% by improving our treatment to further reduce any risks to your excellent drinking water.

You can find out more about water quality – and see an up-to-date picture for your area, here:

Check your water quality

 

0.00

 

 

1.24

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

This measures how often customers need to get in touch with us because they’re concerned about the taste, odour or appearance of the water they’re getting from us.

Better-quality water means customers won’t need to contact so often – we’re aiming for a 23% reduction in contacts.

 

1.04 contacts per 1,000 population

 

1.02 contacts per 1,000 population

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

Internal sewer floods are those that affect customers’ homes. They’re relatively rare, but obviously can be very distressing.

We’re improving our wastewater network, customer support and operational response to cut the rate of these by a further 24%.

See more detail in our Drainage and Wastewater Management Plan (DWMP):
Severn Trents DWMP

 

1.54 incidents per 10,000 sewer connections1.21 incidents per 10,000 sewer connections
What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

External sewer floods are those that happen in gardens and other outside areas of customers’ homes. They can pose a risk to public health and may spread to homes and businesses.

We’re making our wastewater network stronger, giving it more capacity and clearing blockages quickly to make a further 7% reduction in the rate of these cases.

See more detail in our Drainage and Wastewater Management Plan (DWMP):

Severn Trents DWMP

 

15.29 incidents per 10,000 sewer connections

 

14.46 incidents per 10,000 sewer connections

 

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

Our water and wastewater operations are ‘plumbed into’ the landscape around us, and everything we do has an impact on nature. We want to improve the areas we cover, for the benefit of plant and animal life. The way this is measured in England is called a ‘Biodiversity Unit’.

Biodiversity Units look at the ‘before’ and ‘after’ of a site we’re developing. They’re based on factors like the type and health of the habitat, its ecological value, and how important it is in the wider area. Adding more Biodiversity Units shows that work has improved the natural environment.

Across our area, we plan to make a net increase of 271 Biodiversity Units, leading to benefits such as reduced extinction risk, better resilience to climate change, improved water quality, pollination and clean air.

You can find out more about our approach to biodiversity, including our strategy and action plans, here:

Severn Trent and biodiversity

0.00 Biodiversity Units per 100km2 of company area1.38 Biodiversity Units per 100km2 of company area
What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

Treating wastewater generates greenhouse gas – including methane from the wastewater itself, and CO2 from the energy we use. If we treat more in the future, due to increased population and climate change, there’s a risk of more greenhouse gas entering the atmosphere.

Despite this, we plan for no overall increase in greenhouse gas emissions from wastewater treatment over the period, by re-using biomethane as a source of energy, alongside new technology to operate more efficiently.

We measure this using ‘tonnes of CO2 equivalent’ (tCO2e).

You can see more about our approach at our Net Zero Hub:

Net Zero Hub

 

-4.82% reduction from 2024/25 tCO2e baseline

(i.e. increase by no more than 4.82%)

 

8.37% reduction from 2024/25 tCO2e baseline

(i.e. an actual reduction)

 

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

Producing around 2 billion litres of clean drinkable water every day generates greenhouse gases – mainly from the energy needed to move water around the network, but also from the treatment process itself at some sites.

The coming years are going to increase the demand, as we deal with a changing climate and growing population. Despite this, we’ll develop our water networks so that there is no overall increase in greenhouse gas emissions.

We measure this using ‘tonnes of CO2 equivalent’ (tCO2e).

You can see more about our approach at our Net Zero Hub:

Net Zero Hub

 

-3.81% reduction from 2024/25 tCO2e baseline

(i.e. increase by no more than 3.81%)

 

-6.82% reduction from 2024/25 tCO2e baseline

(i.e. an increase of 6.82%)

 

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

You want to know that the water we treat gets to you and your neighbours and isn’t lost on its journey.

We aim to reduce the water lost through leaks by a further 16% by 2030, a forecast reduction of around 55 million litres per day (Ml/d). To do this, we’ll upgrade our network, replace more than 1,000km of new water mains and respond to leaks more quickly. Leakage has been falling since 1990, and we want that progress to continue.

Reducing leaks is a key part of our Water Resources Management Plan (WRMP):

Severn Trent's WRMP

21.0% reduction from 3-year average

Ml/d baseline

23.3% reduction from 3-year average

Ml/d baseline

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

PCC is the average amount of water each person uses each day. Using less water helps protect long-term supplies, can save customers money, and reduces the amount we need to take from nature.

Some of the actions we’re taking include rolling out more metered bills, helping customers with Home Water Efficiency Checks, and helping customers with leaks at home. We aim to reduce PCC by 7% over the period, aiming for 122 litres per person per day (l/p/d) by 2030.

Helping people use water more efficiently is a key part of our Water Resources Management Plan (WRMP):

Severn Trent's WRMP

3.0% reduction from 3-year average

l/p/d baseline

-0.3% reduction from 3-year average

l/p/d baseline

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

This measures the demand for water from non-household customers, across all types of businesses and services.

We’re working with businesses and water retailers to improve their efficiency, offering support such as water use audits and flow control valves. We aim to reduce business demand by 1% by 2030.

 

-2.5% reduction from 3-year average

l/p/d baseline

(i.e. increase by no more than 2.5%)

3.7% reduction from 3-year average

l/p/d baseline

(i.e. an actual decrease)

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

This measures the total number of pollution incidents across every 10,000km of sewers we operate. Clearly it’s important we avoid incidents, and in recent years we’ve been one of the industry’s top performers, achieving the maximum Four Star EPA rating from the Environment Agency.

We’re not standing still on this and aim to maintain our industry leading performance over the coming period, with enhanced pro-active maintenance of our sewers and improved monitoring so we can react to potential issues before they lead to a pollution incident.

This performance commitment is changing in 2026. Our regulators are resetting the target to be the average performance of all wastewater companies.

To see more detail, read our Pollution Incident Reduction Plan (PIRP):

Severn Trent's PIRP

 

25.02 per 10,000km of sewer network

 

19.03 per 10,000km of sewer network

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

Serious pollution incidents include those that cause measurable or severe damage to the environment, fish kills, adverse impact on water quality, human health or property.

We want serious pollution incidents to be as close to zero as possible. Through our work across the 90,000km sewer network, we aim to have no more than one serious incident a year.

To see more detail, read our Pollution Incident Reduction Plan (PIRP):

Severn Trent's PIRP

 

0 incidents

 

2 incidents

What you can expect from usPCL for 2025-30Latest Performance (1 April 2025 - 30 March 2026 [PS1]) 

The Environment Agency sets and monitors limits on what our water and wastewater sites can release into the environment. If a site fails to meet these conditions (called a ‘discharge permit’), its outflows may not meet the standards and could harm the environment.

This condition makes it important that we keep all of our sites running properly, efficiently and to standard. Over the period to 2030 we aim to maintain at least 99% compliance.

100% compliance

99.32% compliance

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

We now have officially-designated Bathing Water sites on the River Severn at Ludlow, Shrewsbury and Ironbridge in Shropshire. These have been designated relatively recently, so we’re starting to work up specific plans at each location.

We’ve already made a strong start around Ludlow, with advanced treatment at three sites to further reduce

bacteria and support water quality standards beyond current regulatory requirements. Some of the options for improvements at other sites are extensive, long-term in nature and will need support from local communities and partners.

Clearly our overall plan is to improve, but in the period to 2030 we aim to at least maintain the current status of bathing waters.

You can see our most recent submission on our current bathing rivers sites here:

Inland Bathing Water submisson

Weighted percentage of bathing water status is 0.00%

Weighted percentage of bathing water status is 0.00%

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

Phosphorus – a major component of wastewater – contributes to rivers failing to achieve good ecological status, so it’s important that we reduce it to improve water quality and support aquatic ecosystems.

We invest in sites where we can improve their operation, enhancing phosphorus removal. New technologies and treatment upgrades mean we can meet newer, tighter standards.

By 2030, our work here means we expect to see a further 45% reduction in phosphorus, which is equivalent to 164 tonnes every year removed.

Phosphorus isn’t the only factor affecting rivers, of course. Over the same period, we expect to have addressed 99% of the ‘Reasons for Not Achieving Good Status’ assigned to us, with the remaining 1% resolved as soon as possible afterwards. Recognising the impact agriculture can have, we also plan interventions benefitting 8,393 hectares of farmland, affecting 10% of all waterbodies in our region.

You can see more about the range of work we’re doing in and around rivers here:

Get River Positive

37.87% reduction in phosphorus emitted

38.15% reduction in phosphorus emitted

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

Storm overflows release diluted wastewater into rivers and streams when the sewer system is overloaded. They should operate only in exceptional circumstances, so we want to reduce how often they spill and how long each spill lasts. As climate change brings more frequent heavy rain, we also need to make sure the network can cope.

We’ve already made progress with over 3,000 improvements across the network. Between now and 2030 we’re doing more and aim to see a further 26% reduction in spills.

To see the current real-time data on overflows, go here:

Severn Trent EDM data and map

Average 18.80 spills per overflow each year

Average 16.35 spills per overflow each year

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

This is a measure of how well we’re looking after the infrastructure that delivers clean drinking water to millions of people across our area.

By keeping our water mains in good condition and replacing more than 1,000km of pipes through our Mains Renewal Programme, we aim to maintain the current repair rate. This should mean fewer supply interruptions and less disruption for local communities.

116.7 repairs per

1,000 km of water

network

125.0 repairs per

1,000 km of water

network

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

This measures how available and resilient our water treatment assets are. If we maintain them effectively, all customers can rely on a secure supply. The lower our unplanned outage, the better for everyone.

We achieve this by closely monitoring how each site is performing and being able to act quickly if there’s a risk of reduced output. We generally see unplanned outage at less than 2% and seek to maintain this over the period. 

No more than 2.14% of peak

week production

capacity

1.33% of peak

week production

capacity

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

The number of sewer collapses shows how well we’re looking after these important underground assets. Collapses can cause customer disruption, flooding and environmental harm.

We’re running programmes to proactively inspect our sewers, spotting defects before they cause a collapse and carrying out repairs in high-risk areas. We’re already performing well against our target and expect to reduce the rate of sewer collapses by a further 13%.

7.80 collapses per 1,000km of

wastewater network

6.93 collapses per 1,000km of

wastewater network

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

C-MeX shows how satisfied customers are with their water company. Ofwat oversees the measure, which is  based on independent surveys about day-to-day service, and your experience if you ever need to contact us about anything.

While our performance here has been good in places, overall C-Mex for Severn Trent customers is below the average level set by water companies in general. We want to do better.

Our aim for 2025–2030 is to improve customers’ experience and achieve a C-MeX score above the water industry benchmark. We’ll improve our systems and processes, develop our contact centres and communicate more clearly with you.

N/A

62.04

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

D-MeX shows how well water companies support developers with new water connections. Each year, developers bring thousands of new homes to our area and it’s important that we can meet their needs, and those of new homeowners.

 

We already have a good record in this area, providing a tailored and responsive experience to both larger developers and smaller homebuilders. For the 2025-2030 period we aim to maintain our industry-leading performance.

N/A

88.29

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

This is a relatively new measure, looking at the service we provide to business customers and water retailers. Water retailers are licensed companies that manage billing and other customer-facing services for non-household customers.

Our work here includes developing new teams to support business customers, dealing with operational incidents proactively and reducing the need for them to contact us – allowing them to get on with running their businesses.

For the 2025-2030 period we want our performance for this measure to be better than the industry median.

N/A

78.04

What you can expect from usPCL for 2025-30Latest Perfomance (1 April 2025 - 30 March 2026 [PS1])

We deliver hundreds of projects each year, from major programmes to smaller local improvements. Capital carbon is the greenhouse gas emitted through the materials and construction work used to deliver these projects.

Capital carbon measures how well we’re reducing the carbon cost from the initial plan to the final delivery. By being innovative with our designs and using new ways of working, we can very often significantly reduce the amount of carbon involved in these vital projects. Lower emissions, low-carbon design and construction, and better carbon data helps us progress towards net zero.

During a period with our highest-ever level of capital projects, we aim to reduce capital carbon by 5% compared with our initial project plans. This would avoid thousands of tonnes of CO2 emissions (tCO2e).

N/A

29.61% reduction

from tCO2e design

baseline

For more detail on our progress against each of these targets, you can read our Annual Performance Report for 2025/2026.

See what we’re investing in your area

We’re investing in communities across our region. Choose your area to see what we’re doing near you.

 

Keeping bills fair

We know no one ever wants to hear that their bill is going up. Times are tough, and every extra pound matters.

That’s why we’re doing everything we can to keep bills as affordable as possible while still making the investment needed to improve the services people rely on every day.

In 2026/27, the average household bill for water and sewerage will be around £587 a year, or about £1.61 a day.* Even with these changes, our bills remain the second lowest in England and Wales, and we expect that to stay the case up to 2030.

*Average daily combined (metered and unmeasured customers) cost for 2026/27 is £1.61.

Listening to you

It’s only right that we should listen to you and act on what you tell us.

We based most of our planning for 2025-2030 on what customers like you told us was important. And you can get involved in helping us form our future plans.

Whether that’s one-off feedback, or by joining TapChat, our online community of Severn Trent customers, your view makes a massive difference.