Pipe laying in private land

Our code of practice for pipe-laying in private land, planning a route, consultation and notice of work, laying the pipes and the completion of works.

This document contains

  • Pipe-laying in private land - Summary of reasons why we may need to lay pipes on private land (page 3)

Before the work

  • Planning a route - The factors we take into consideration when planning the route pipes will take (page 4)
  • Consultation and notice of work - Including (page 4):
  • The consultation process we will take
  • The timing of the work 
  • When it will appropriate to work with an agent
  • How we will make a full schedule of the condition of the working area
  • The availablity of existing land drains
  • Contact details for the work supervisor
  • The location of pipes and equipment in relation to the work which will be carried out.

During the work

  • Laying the pipes - Including (page 6):
  • How the work will be supervised
  • How access for owners and occupiers will be impacted
  • The access required for ourselves
  • The security of your property and the working strip
  • How we will manage topsoil
  • How we will manage trees and hedgerows
  • What we will do if we disturb any existing land drainage
  • How we will lay pipes beneath a watercourse
  • What will happen if we damage or interupt water supplies
  • What we will do if notified of infectious disease
  • Fishing and sporting rights
  • The facilities we will provide for our workers
  • Private agreements with contractors
  • What we will do in the event explosives are required
  • Cathodic protection and temporary support
  • How we will manage any fossils or artefacts discovered.

After the work

  • Completion of the works - Including (page 9):
  • How we will restore the area where we have worked.
  • The information we will provide you about the work
  • When you will be entitled to compensation
  • The process you will need to take if you wish to make a complaint.
  • Exceptions - Including (page 11):
  • When we may need to perform emergency works
  • When we may need to lay a pipe in response to a requisition.
  • Glossary of terms - Explanation of industry terms used throughout the code of practice (page 11)