How do I get the pipe work adopted?

Adoption

Once the connection work has been inspected and signed off by us, we will then issue out the paperwork to confirm if the pipe work will remain the property owners responsibility or if we have taken responsibility (known as a vesting certificate).

This is based on the position and location of the public sewer. In most cases  we will adopt the lateral drain lengths within the public highway up to the demarcation chamber that is constructed within 1m of the property boundary.